The High Commission for Industrial Security, referred to as HCIS, is the national regulatory agency for Security, Safety & Fire Protection requirements at industrial facilities and designated critical infrastructure, Kingdom-wide.
GRAVITY ARABIA is a security contractor is offering the services for stage 3 and stage 4 design for security projects.

Stage 3 Design – Detailed Design
GRAVITY
ARABIA will provide the complete Stage 3 Detail Design (DD), which provides
full detail of the security system design required to proceed with the construction
and installation of security infrastructure & security systems.
Stage 4 Design – Operational Readiness
After completion of stage 3 design, we will provide the final stage 4 design of the project. In stage 4 design we will do the testing, commissioning and handing over of the security system for operational use to the Facility operator.